Construction l Electrical & ELV Installation
Client: Hong Kong Cingleot Investment Management Limited
Architect: Aedas
Main Contractor: Able Engineering Holdings Limited, Build King Holdings Limited (Joint Venture)
Commencement/Completion: 2020/2023 (anticipated)
Project Features:
Designed to international standards in environmental sustainability, as accredited by BEAM Plus Gold and LEED Gold, the 12-storey Cingleot Premium Logistics Centre will occupy a site of about 5.3 hectares, comprising of approximately 380,000 square meters (gross floor area) of storage and processing facilities. It also consists of a cargo area, a parking lot, a canteen and a café.
With a maximum floor height of 110m, the facility will also be one of the most versatile and future-proofed logistics centers constructions. Features include fully automated warehousing, temperature-controlled handling solutions, an air cargo processing centre, a sorting centre, and a fulfilment centre. It will also feature ramp access to all floors, as well as structural designs that enable the use of robotics and automated technology.