Meco
title

128 WATERLOO

HO MAN TIN

<  Back To Projects

Construction l Electrical & ELV Installation

Client: Great Prosper Development Limited

Architect: WCWP International Limited

Main Contractor: Cheung Kee Fung Cheung Construction Company Limited

Commencement/Completion: 2019/2021

Project Features:

A smart home system was built for 128 WATERLOO, enabling off-site voice control as a one-step solution for complete home management, incorporating indoor temperature control, lighting, curtain settings, air quality monitoring and humidity level adjustment.

Master bathrooms of 3 and 4-bedroom units as well as the penthouse are equipped with heated floors, an uncommon feature amongst Hong Kong residential buildings.

The lift at 128 WATERLOO incorporates touchless button technology, which allows residents to access the common floor as well as their own floor by simply using a smart card or waving one’s hands.

128 WATERLOO is qualified for HKGBC BEAM Plus.