Construction l Electrical Installation, AC Installation
Client: Wheelock Properties (Hong Kong) Limited
Main Contractor: Meco Engineering Limited
Commencement/Completion: 2019/2020
Project Features:
The podium retail complex of Island Residence includes three 1-storey and two 2-storey retail stores located on the ground floor.
Conducted electrical and air-conditioning system installations.